Heat Waste Incinerator Layout D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimum Weight( Kg) -4000 kg Added Chamber
(double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, solitary
phase 50-60Hz Minimum operating temperature degree 1200 oC One year extra parts bundle for full maintainability 10m pipe
pipe. 1100 litre fuel Storage tank +pipeline system Containerised (the container will definitely function as housing) Added smokeshaft development
Incinerator Spare Parts
Incinerator Spare Parts
Incinerator Spare Parts
Incinerator Spare Parts
Incinerator Spare Parts
Incinerator Spare Parts
Incinerator Spare Parts
1 metre high One (1) year warranty.
Heater of 20 Kg: 03 Gadgets
Electrically controlled burner.
Two-compartment heater with a capacity of 20 kg/ hour.
Burner with minimized upkeep as well as operating expense; Prepared with an automated control board as well as very simple to utilize with
electro-magnetic securing of the door.
A major waste decline chamber of 900 ° C. A post second burning chamber of gases developed in the main chamber
at the minimum 1100 ° C.
Carbon deposits in ash much less than 5% by weight in accordance with European Directive 2000/76/ EC.
With refractory cellular lining in products of better
1/ Cost of a 200kgs/Hr medical waste heater.
2/ (CIF Term) Cost of distribution from making center to PAPUA NEW GUINEA port of LAE, Morobe district
3/ Cost of 2 Clover engineers to Oversee, Setup, Educating our engineers and designating the clinical; waste
incinerator.

