Physical /Chemical Characteristics: Boiling Point (_F) : N/A Appearance & Odor: Off white, odorless Vapor Pressure(mm Hg): N/A Volatiles (% by weight): N/A Vapor Density (Air =1) :N/A Evaporation Rate )n-butylacetate=1): N/A HMIS Classification : Health:1; Flammability: 1 Reactivity Data: Stability: Stable Conditions to Avoid: None Know Incompatibility (materials to avoid: Strong oxidizers […]
combustion chamber and one flue gas afterburning chamber. The incinerator must be able to meet the following parameters: 1.Treatment capacity of: a) 50 kg waste per hour. 2.Temperature: Main combustion chamber up to 850°C, and in the second chamber > = 1,100 °C 3.Retention Time: 2 seconds in the second chamber […]
Manual autoclave with vertical loading; gravity displacement type with possibility for Vacuum. Capacity: Up to 12 kg/h Chamber size: >150 liters Material: Stainless steel Temperature: 134 °C Further information: Minimum autoclave chamber size shall be 150 liters and shall have a usable volume (loading basket) of 100 liters. Shall […]
The manufacturer must provide a declaration that the pressure vessel is manufactured in accordance with relevant guidelines for pressure equipment. Following accompanying documents should be supplied with the treatment system and shall be available at the Site: 1.Operation instructions (including process description). 2.Loading and maintenance procedures. 3.Short-form of operation and loading procedures. 4.P&I […]
Incinerate: medical waste and general waste Capacity to burn waste: 400 — 500 kg/hr Fuel: Diesel Fuel Consumption: 10 litres/hr maximum Incineration temperature: 950 – 1300 °c Casing: thick (min 5 mm) Stainless steel casing and fully insulated to withstand sea humidity Voltage: 220/240 V or 380/415V Frequency: 50 Hz Feeding: automatic Ash 1 leftovers […]
Operational Capabilities PROCESS MINIMUM 1 TON PER DAY OPERATED WITH LIMITED TRAINING REGULAR MAINTENANCE CAN BE COMPLETED WITH LIMITED TRAINING COMPLIES WITH EURO / OR US-EPA EMISSION STANDARDS ABILITY TO BURN WASTE LUBRICANTS (POL) HANDLE ORGANIC SOLIDS (TO INCLUDE RMW) DEPLOYABLE MOBILE 24 HRS OF CONTINUOUS USE AUTOMATIC LOADING SYSTEM AUTOMATED ASH REMOVAL SYSTEM […]
Capacité destructive de 55 Kg/h jour de déchets hospitaliers avec un p?.c. i jusqu’à 3.200 Kcal/Kg 1)Type de déchet hospitalier 2)Pouvoir calorifique inférieur 3.200 kcal/kg 3)Humidité 20% 4)Teneur en cendres et/ou inertes 8% 5)Capacité destructive nominale 55 kg/h 6)Volume chambre de combustion 1,65 m3 7)Volume chambre postcombustion 2.1 m3 8)Temps transit des fumées en post […]
It must be a 3 chambered burner The loads ability of 250 kg The realty for the incinerator requirement to be able to stand up to the temperatures and additionally different other useful demands. The smokeshaft should certainly have a solid refractory cellular lining of special type of concrete to stand up to temperature degrees […]
5-1- Chambre de post combustion est installée au dessus du foyer de combustion , elle est constituée d’un cylindre métallique revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires. 5-2- Volume intérieur?: 2,1 m3 Est dimensionnée pour pouvoir garantir un temps de fumée de 2 secondes à 1100°C avec un pourcentage d’oxygène […]
Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance. Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The Company will provide the contractor with a list of items […]
Equipped with main combustion chamber and a second chamber for reburning designed to ensure complete combustion of the gases resulting from incomplete combustion of inert gases in the chimney, within the standards recommended by the World Health Organization; Equipped with temperature controller to adjust the air of the combustion of the waste, and fuel […]
The following requirements are to be considered as an integral part of the technical specifications for each equipment type. The system offered shall be designed to operate normally under the conditions of different regions in Kenya. These conditions may include but not limited to power supply, temperature, humidity, and other climatic conditions. […]
It is expected that the Bidder will cooperate closely with PATH and target Hospitals for the new waste handling building/area and will make available all needed technical information, drawings, etc., The following waste streams shall be treated in the new HCW treatment center(s): Infectious waste Sharps waste Pathological waste Pharmaceutical […]
SECTION V TECHNICAL SPECIFICATIONS OF THE INCINERATOR General Description The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to: Overall plant layout Feed chamber/charging Primary combustion chamber Particulate scrubbers Acid gas The stack/chimney. Minimum […]
Finally, steam to the jacket should shut off, the unloading door is to be opened Then the shaft and mixing arms are reversed to act as unloading mechanism and should scoop the waste fragments out of the unloading door, onto a conveyor belt or directly into a waste container. The vessel should now be ready […]
Sterilization time: approx. 30 minutes at 121◦C/1.1 Bar or approx 15 minutes at 132◦C/2.5 Bar to achieve 6log10 sterility Fragmentation inside the chamber: Heavy duty with maximum size of final product <20 cm. Volume reduction of the waste after processing : by 60-80% through complete waste dehydration including liquid content of the waste All actions […]













