I also research their product details and find it don’t require fuel and also not require fan blower but that incinerator can only burn waste with 30%-40% humid. I see if your products can burn waste with 30%-40% humid without fan blower and more 40% humid require fan (Optional solution) which lead us to kick […]
Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone else coming into contact with the often hazardous materials discarded by hospitals and other healthcare sites. Hospital waste varies from site to site and the biggest challenge is to dispose of this wide range of waste streams. Incineration is still the preferred way to process medical waste without endangering the heath patients, staff or anyone else coming into contact with them. Clinical waste is costing more and more to dispose of safely. Health Clinics and Health center can now handle their own waste streams using one of our specialist medical incinerators. Destroying hazardous waste at source is by far the most effective and efficient way of handling waste that could potentially spread diseases or viruses. Requirement 20% -25% of the full waste created by medical treatment facilities is associated to as hazardous and also might develop a selection of health as well as environmental threats if not managed and also harmed in a correct means. HICLOVER is now offering a full range of medical waste incinerators, designed to provide efficient waste destruction, utilizing best available technologies and environmentally friendly process. Due to the secondary chamber with its 2 second retention period, our medical incinerator range is well suited to process medical waste. Our products make sure reliable, neat as well as very easy disposal of […]
Programming controls. Programming controls should be verified as controlling and cycling the unit in the intended manner. Proper prepurge, ignition, postpurge, and modulation should be verified. A stopwatch should be used for verifying intervals of time. ? Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for all conditions of operation and […]
Fully automatic sequential control provided by internal PLC system providing control of: Secondary chamber pre-heat Burn cycle (variable) Cool down cycle Fuel Options Diesel, LPG, Natural or Bio Gas. Typical Fuel Consumption Diesel: 8 / 10 litres per hour Liquid Propane Gas: 6 / 8 litres per hour Natural Gas: 7 / 9 Nm3 per […]
The incinerator fuel tank shall meet the following requirements: a) The tank shall be installed above ground and according to all of the fuel tank requirements in Section 1015 including secondary containment. b) The tank shall be sized to hold a 14 day supply of diesel fuel 6) Manufacturer has to provide the following […]
Anchor all equipment to building floor or structure as shown or as recommended by manufacturer with allowance for thermal expansion as necessary. Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so that all control switches and indicators are within 1700 mm (5.5 feet) of the floor and […]
Including:Incinerator: Structure to be specified The mark to be specified Water temperature: 800 to 1000 ° C; Refractory Temperature of more than 1100 ° C + obtained; Capacity: 20-50 kg / hour Fireplace: 4 to 6 meters high; Dimension 70 cmx70 crn Height: 1.10 meters Fuel: coal; Aspiration: natural – A receiving cage for biomedical […]
Test shall be conducted by factory authorized representative of incinerator manufacturer. Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit. After termination of manufacturer’s predicted burning period, inspect and weigh the residue. Emissions testing may be deleted if not required by state or local […]
The incinerator shall then take supply from the DO tank through its DO feed pumps to its respective burners. An integrating meter shall be installed to measure the volume of DO consumed by the incinerator. Suitable pre metering strainers shall be provided together with a lockable by-pass across both strainer and meter. The meter shall […]
The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests so as to enable sending of one CEB Engineer for witnessing of the factory tests. A ‘Factory Acceptance Test ’ schedule shall be mutually agreed between the successful Bidder and the CEB Engineer. […]
HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. ※ Main Quality:— — — — — Dual Burning Chamber — — Dual Italy Burner – – Burning Cost: 10-100kgs per hr–– – – Burning Chamber: 0.1M3-1.2 M3— — — — Mobile Incinerator, Requirement delivery containers, Easy to move/transport system— — — — Free Installment, Pre-installed heater, Suitable for camps— — — — Ultraviolet […]
standard type, 11m long ,self supporting Capacity-220kgs/hr refuse-hospital waste average moisture-15-20% on fist time DIMENSIONS height: 2710mm length: 2840mm Width; 2450mm loading door opening: 610mm x 610mm Grate/Heath Area: 2.0(square meters) Primary chamber volume: 2.4(cubid meters) secondary chamber volume :2,72(cubid meters0 total volume: 5,12(cubid meters) minimum stack diameter :560mm 300 kg per day healthcare […]
A chamber of post combustion of gases * A burner of combustion of gases, * A device of injection of air allowing a total recombustion of gases, * A device of air inlet of cooling of waste gases, * A sheath of evacuation of the gases burnt. * Carcass in strong sheet steel with support […]
High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber (double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box 220V-240, single phase 50-60Hz Minimum operating temperature 1200 oC One year spare parts package for complete maintainability 10m hose pipe. 1100 litre fuel Tank +pipe […]
Equipment Access Openings: Arrange all equipment and piping to allow access to openings without disassembly of equipment or piping. Provide space which permits full opening of all doors, panels, and other access openings. Operating Space: Do not reduce or alter personnel working spaces shown except with prior approval of Resident Engineer. Fuel Oil […]
heavy Duty Steel casing High Quality refectory lining & insulation 1 x Diesel fired ignition burners operated on / off Front Loading Door (safety catch Separate Ash removal Door 2.7 CONTROL UNIT The entire processing cycle and the combined effect of the individual components of the incinerator shall […]